Spokane Civic Theatre
Updates & Upgrades!
Major changes to Spokane’s North Bank surrounding the Spokane Civic Theatre highlighted serious deficiencies within the structure that needed to be addressed. Originally built in 1966 the building does not meet current ADA or environmental efficiency standards. This structure also lacked the necessary acoustical attributes to insulate it from outside noise generated by new sports arena neighbors. Our team designed conceptual upgrades to bring the building up to code, isolate it’s performance areas for optimal enjoyment and add necessary space for administration, production and future growth and expanded programs.
Interior Concepts
360 VR Interiors
Below are some 360/full circle VR capable views of a few of the interior concepts our design team produced.